Energy meter LE-03d CT400

Three-phase energy meter. To co-operation with a current transformers. Maximum current 100A.
LE-03 CT meters are intended for current transformers with a secondary current of 5A. Maximum measured current of the system is specified by the value of the primary current while using the current transformer.

SKU: LE-03D-CT400 Category: Tag: